Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3662463 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : 85973 Repair / Maintenance Of Vcb, Acb Protective Devices, Ht Ug Cables, Ht Distribution System, Transformer And Other Miscellaneous Ht Work Of Elect Supply In New Chsc And Other Connected Area Under Age E/m-ii Of Ge (south) Pune |
| Last Date For Submission | 15th Apr, 2026 |
| Opening Date | 22 Apr, 2026 |
| Document Cost | 1000.00 |
|---|---|
| EMD | 102000.00 |
| Estimated Cost | 5110000.00 |
| City | Pune |
|---|---|
| State | Maharashtra |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | M&L for Plant/Machinery for Dehydration and Filteration of 22/0.415 KV grade Transformer oil for extracting moisture content in the oil and carbon deposits and achiving the dielectric strength to 45 KV for 1 minute with a sphare gap of 2.5 mm and also checking the acidity of oil with acidity test kit and submitting the necessary test kit report /certificate, refilling the filtered oil into the transformer all as specified and directed by Engr in charge. Note: The filtration includes taking necessary connection to filtration plant from the transformer to their hose pipe by opening the inlet and outlet of transformers and closing the same after filtration. | ||
| 2 | 2000 KVA, Make - Voltamp | 9440.00 | PER LITRE |
| 3 | 500 KVA, Make - Voltamp | 2700.00 | PER LITRE |
| 4 | 350 KVA, Make - Pactil | 1275.00 | PER LITRE |
| 5 | Preventive Maintenance and Servicing of 22/0.415 KV Power Transformer outdoor type by disconnecting carefully electric connection on primary & secondary side by disconnecting incoming and outgoing HT/LT cables/sandwitch duct connection and remove the transformer tank top cover/lid, draining out the transformer oil and keeping in safe custody in clean and dry containers for reuse. and carrying out the maintenance work by experienced and qualified Engineer, dismantling the OLTC, dismantling HT/LT bushings from core winding and lifting the core assy carefully without damaging by using the tripod/ chainpully/crane etc, cleaning / removing the sludge from the transformer tank, cleaning the OLTC and checking the serviceability of the coil / core winding, checking the condition of the body, cleaning the coil/core assy, refixing of core/core assy, OLTC, HT/LT winding connection, connection of protective devices like buckholz relay connection, winding temperature indicator ,oil temperature indicator including fixing new gaskets to transformer top and all other places gaskets/washer, terminal studs of HT/LT sides and reassembling of transformer after repairs, refitting the transformer coil incl improvement of insulation resistance value within desired level by heating or any other method to required level complete all as directed to the entire satisfaction of Engr in Charge. (Note- Filteration of oil will be measured and paid separately) |
6 Days Left