Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 5005125 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Corrigendum : 1) Widening Improvement To Borghar Tambe Belsar To Nirgude Phata Road, Mdr 63 Km 0/000 To 7/500, Tal Ambegaon, Dist. Pune. (part- Borghar To Taluka Border (b) Widening Improvement To Dimbhe Borghar Ahupe Balvirwadi Kondhawal To And Other 6 Works |
| Last Date For Submission | 5th Aug, 2026 |
| Opening Date | 07 Aug, 2026 |
| Document Cost | 3540.00 |
|---|---|
| EMD | 4014000.00 |
| Estimated Cost | 802752960.00 |
| City | Pune |
|---|---|
| State | Maharashtra |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | A1)Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 milimetre, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 milimetre in thickness. | 11600.00 | One Square Metre |
| 2 | A2)Excavation for roadway in earth soil of all sorts, sand, gravel or soft murum including dressing section to the required grade camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50 metre and spreading for embankment or stacking as directed. | 11692.58 | One Cubic Metre |
| 3 | A3)Excavation for roadway in hard murum and boulder including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50 metre and spreading for embankment or stacking as directed. | 7210.42 | One Cubic Metre |
| 4 | A4)Excavation for roadway in hard rock by wedging and chiselling or line drilling including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50 metre and spreading for embankment or stacking as directed. | 584.63 | One Cubic Metre |
| 5 | A5)Clearing grass and removal of rubbish up to a distance of 50 metre outside the periphery of the area . | 39875.00 | One Square Metre |
6 Days Left