Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Public Works Department
Tender ID5007783
Organisation NamePublic Works Department
Tender BriefCorrigendum : A) Improvement Widening To Rakaswadi Uksan Pale Nanemaval Karanjgaon Kambre Valak Takave Kh To Nh 48 Connecting Road Mdr 229 Km 19/000 To 25/500 Tal. Maval Dist -pune. (for Pune Grand Challenge Tour 2027) And Other 6 Works
Last Date For Submission5th Aug, 2026
Opening Date07 Aug, 2026
Cost
Document Cost5900.00
EMD3818500.00
Estimated Cost763660042.00
Location
CityPune
StateMaharashtra

Register to see full details

BOQ Items
#ItemQtyUnits
1A1) Excavation for roadway in earth soil of all sorts, sand, gravel or soft murum including dressing section to the required grade camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50 metre and spreading for embankment or stacking as directed.6088.88One Cubic Metre
2A2) Excavation for roadway in hard murum and boulder including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50 metre and spreading for embankment or stacking as directed.1826.66One Cubic Metre
3A3) Watering and compacting of embankment formed of materials obtained from the road cutting, within a lead of 50 metre, not less than 97 percent of standard proctor density after laying them in layers of 20 centimetre to 30 centimetre with vibratory roller.4505.77One Cubic Metre
4A4) Providing earth work in embankment with approved materials obtained from other sources upto lead of 50 metre including all lifts, laying in layers of 20 centimetre to 30 centimetre thickness breaking clods, dressing to the required lines, curves, grades and section, watering and compaction with vibratory roller with V-Sat attachment to achieve not less than 97% of standard proctor density etc. complete (Material obtained from Other sources).7362.08One Cubic Metre
5A5) Supplying hard murum at the road site including conveying and stacking complete.4090.73One Cubic Metre