Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4656259 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Addn/ Altn And Special Repair To Certain Building At Command Hospital Under Ge (south) Pune |
| Last Date For Submission | 22nd Jul, 2026 |
| Opening Date | 29 Jul, 2026 |
| Document Cost | 3000.00 |
|---|---|
| EMD | 870000.00 |
| Estimated Cost | 109000000.00 |
| City | Pune |
|---|---|
| State | Maharashtra |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Demolition of cement concrete below or above ground level, unreinforced, not exceeding 15 cm thickness, including removal of debris from site, complete all as specified and directed by Engineer-in-Charge. Note: Rate inclusive of removal of debris to outside defence land | 372.42 | Per Cubic metre |
| 2 | M & L for cement concrete 1:2:4 (Type B0) using 12.5 mm graded stone aggregate, for roof kerbs or mud stops,rounded or chamfered on edges , including compaction, curing, and making good, complete as specified and directed. | 5.00 | Per Cubic metre |
| 3 | M & L for cement concrete 1:3:6 (Type C1) using 20 mm graded stone aggregate, for coping,roof kerbs or mud stops,rounded or chamfered on edges , including compaction, curing, and making good, complete as specified and directed. | 9.00 | Per Cubic metre |
| 4 | M&L cement concrete M-15 Type B1 (1:2:4) using 20 mm graded coarse aggregate, 100 mm thick, laid in hardstanding &spike rolling to surfaces or making impressions of expanded metal,while the concrete is green , including mixing, laying, compacting, and finishing, complete as specified and directed by the Engineer-in-Charge. | 460.00 | Per Square metre |
| 5 | M&L for RCC M-15 type B0 using 12.5 mm graded aggregate in lintels up to 1.5 m clear span, cills, steps, seismic and other similar bands, plinth courses, string courses, lacing courses, parapets and railings up to 60 cm in height, copings, kneelers, apex stones, bed plates, kerbs (excluding water troughs) including weathering, slightly rounded or chamfered angles and throating, complete with all labour, materials, formwork, compaction, and as directed by the Engineer-in-Charge. Note: TMT reinforcement will be measured and paid seperately. | 12.10 | Per Cubic metre |
15 Days Left