Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Military Engineer Services
Tender ID4656259
Organisation NameMilitary Engineer Services
Tender BriefCorrigendum : Addn/ Altn And Special Repair To Certain Building At Command Hospital Under Ge (south) Pune
Last Date For Submission22nd Jul, 2026
Opening Date29 Jul, 2026
Cost
Document Cost3000.00
EMD870000.00
Estimated Cost109000000.00
Location
CityPune
StateMaharashtra

Register to see full details

BOQ Items
#ItemQtyUnits
1Demolition of cement concrete below or above ground level, unreinforced, not exceeding 15 cm thickness, including removal of debris from site, complete all as specified and directed by Engineer-in-Charge. Note: Rate inclusive of removal of debris to outside defence land372.42Per Cubic metre
2M & L for cement concrete 1:2:4 (Type B0) using 12.5 mm graded stone aggregate, for roof kerbs or mud stops,rounded or chamfered on edges , including compaction, curing, and making good, complete as specified and directed.5.00Per Cubic metre
3M & L for cement concrete 1:3:6 (Type C1) using 20 mm graded stone aggregate, for coping,roof kerbs or mud stops,rounded or chamfered on edges , including compaction, curing, and making good, complete as specified and directed.9.00Per Cubic metre
4M&L cement concrete M-15 Type B1 (1:2:4) using 20 mm graded coarse aggregate, 100 mm thick, laid in hardstanding &spike rolling to surfaces or making impressions of expanded metal,while the concrete is green , including mixing, laying, compacting, and finishing, complete as specified and directed by the Engineer-in-Charge. 460.00Per Square metre
5M&L for RCC M-15 type B0 using 12.5 mm graded aggregate in lintels up to 1.5 m clear span, cills, steps, seismic and other similar bands, plinth courses, string courses, lacing courses, parapets and railings up to 60 cm in height, copings, kneelers, apex stones, bed plates, kerbs (excluding water troughs) including weathering, slightly rounded or chamfered angles and throating, complete with all labour, materials, formwork, compaction, and as directed by the Engineer-in-Charge. Note: TMT reinforcement will be measured and paid seperately.12.10Per Cubic metre
22nd Jul, 2026

15 Days Left

WhatsApp