Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Military Engineer Services
Tender ID3702998
Organisation NameMilitary Engineer Services
Tender BriefCorrigendum : Construction Of Fire Lane And Perimeter Wall Infra For Gas Pipe Line Under Ge Dehu Road
Last Date For Submission17th Apr, 2026
Opening Date24 Apr, 2026
Cost
Document Cost3000.00
EMD945000.00
Estimated Cost124000000.00
Location
CityPune
StateMaharashtra

Register to see full details

BOQ Items
#ItemQtyUnits
1Earth work in excavation of all kinds of soil by mechanical means (Hydraulic excavator) / manual means, over areas (exceeding 30 cm in depth, 1.5 m in width, or 10 sqm on plan), including getting out the excavated earth with lead up to 50 m and lift up to 1.5 m, as directed by the Engineer-in-Charge.21,037.50Cum
2Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (depth not exceeding 1.5 m, width not exceeding 1.5 m, or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil within a lead of 50 m, for all kinds of soil, complete all as specified and as directed by the Engineer-in-Charge.1,260.00Cum
3Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (depth not exceeding 1.5 m, width not exceeding 1.5 m, or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil within a lead of 50 m, for soft/ disintegrated or ordinary rock, complete all as specified and as directed by the Engineer-in-Charge.35.00Cum
4Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (width not exceeding 1.5 m or 10 sqm on plan), for depth exceeding 1.5 m but not exceeding 3.0 m, including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil within a lead of 50 m, for all kinds of soil, complete all as specified and as directed by the Engineer-in-Charge.60.00Cum
5Rolling and consolidating formation surfaces with power roller of 8 to 12 tonne capacity, including watering, consolidating to the required level, gradient and camber, filling in hollows and depressions during the process, complete as specified and as directed by the Engineer-in-Charge2,125.00Ten Sqm
17th Apr, 2026

6 Days Left

WhatsApp