Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4458353 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Periodical Services To Internal Wall Surfaces, Internal Wall Plaster Of Married Areas At Ins Shivaji Lonavla |
| Last Date For Submission | 29th Jun, 2026 |
| Opening Date | 01 Jul, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 70000.00 |
| Estimated Cost | 3500000.00 |
| City | Pune |
|---|---|
| State | Maharashtra |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | M&L for Preparation of old plastered surfaces of walls,Pillars, cornices etc by brooming down with steel wire brush, scraping down smoke shoot, moulds, moss and efflorescent salts and trading oil and greasy spots and Washing, rubbing down and stopping of distempered and painted surfaces applying one coat of white wash on the walls, pillars, cornices including touchup putty filling as required. and putting aside the furniture etc. by skilled labour etc complete all as specified and as directed by Engineer-in-Charge. | 380.00 | Sqm |
| 2 | All as per Srl Item No 1 here-in-before but on ceiling including touchup putty filling as required. | 5050.00 | Sqm |
| 3 | M&L for Preparation of old plastered surfaces of walls,Pillars, cornices etc by brooming down with steel wire brush, scraping down smoke shoot, moulds, moss and efflorescent salts and trading oil and greasy spots and Washing, rubbing down and stopping of distempered and painted surfaces and applying one coat of oil bound distemper on the walls, pillars, cornices including touchup putty filling as required incl putting aside the furniture and covering with polythine till the painting work etc. complete all as specified and as directed by Engineer-in-Charge. | 16350.00 | Sqm |
| 4 | All as per Srl Item No 3 here-in-before but two coat of oil bound distemper including touchup putty filling as required. | 5000.00 | Sqm |
| 5 | M&L for complete removal of existing treatment of wall and applying two coat of oil bound distemper, over a coat of primer, over two coat of wall care putty, complete all as specified and as directed by Engineer-in-Charge. | 6300.00 | Sqm |
6 Days Left