| Tender ID | 5160812 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Provn Of 02 Multipurpose Training Sheds At Khadakwasla Under Ge (p) Nda. |
| Last Date For Submission | 16th Sep, 2026 |
| Opening Date | 23 Sep, 2026 |
| Document Cost | 3000.00 |
|---|---|
| EMD | 850000.00 |
| Estimated Cost | 105000000.00 |
| City | Pune |
|---|---|
| State | Maharashtra |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | SCH 'A' PART-I ( BUILDING/STRUCTURES) Note: This schedule is not pre-priced by MES and the rate indicated as "Rs 0.00" under Col 5 signifies this fact only | ||
| 2 | Design and construction of multipurpose training shed (Shed-1) using a Pre-Engineered Building (PEB) steel structure of minimum dimensions as indicated in the Architectural drawings & Annexure-I. The scope includes structural design, fabrication, supply, and erection of the PEB with complete supporting framework, roofing, cladding enclosures, connected architectural and service accessories, rainwater drainage system, ventilation provisions, and all structural and non-structural components as required. The work further comprises site clearance, earthwork in excavation, construction of foundation as per design, anchoring systems, base plates, grouting, and any other associated civil works. The entire facility shall be constructed with permanent specifications and finishes in accordance with the Architectural drawings and as specified and directed by the Engineer-in-Charge | 1.00 | EACH BLOCK |
| 3 | Design and construction of multipurpose training shed (Shed-2) using a Pre-Engineered Building (PEB) steel structure of minimum dimensions as indicated in the Architectural drawings & Annexure-I. The scope includes structural design, fabrication, supply, and erection of the PEB with complete supporting framework, roofing, cladding enclosures, connected architectural and service accessories, rainwater drainage system, ventilation provisions, and all structural and non-structural components as required. The work further comprises site clearance, earthwork in excavation, construction of foundation as per design, anchoring systems, base plates, grouting, and any other associated civil works. The entire facility shall be constructed with permanent specifications and finishes in accordance with the Architectural drawings and as specified and directed by the Engineer-in-Charge Note: | 1.00 | EACH BLOCK |
| 4 | Schedule A Part-II to IX Note: This schedule is pre-priced by MES and the rate indicated under Col 5 signifies this fact only | ||
| 5 | Total amount of Sch 'A' Part-II ( SITE CLEARANCE, EXCAVATION AND EARTH WORK ) | 1.00 | LUMP SUM |