Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3815314 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Special Repair To Roof Treatment Of School Building At Kv No 2 At Af Stn Pune Under Ge (af) Lohegaon |
| Last Date For Submission | 20th Apr, 2026 |
| Opening Date | 25 Apr, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 96000.00 |
| Estimated Cost | 4800000.00 |
| City | Pune |
|---|---|
| State | Maharashtra |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Taking down old existing water proofing treament from the top of RCC/arch slab, including demolition of existing PCC padding, plaster, brick bat coba (upto the thicknes of 15cm) and hacking the top of RCC slab, cleaning with water and disposal of rubbish off the premises. Complete all as specified and directed. | 1900.00 | Sqm |
| 2 | Demolition of cement concrete of any description and in any position not otherwise specifically provided for | 18.39 | Cum |
| 3 | M&L cement concrete type B1-1 1:2:4 (using 20mm graded aggregate) as in roof padding, roof/chajjas kerbs or mud stops, rounded or chamfered on edges, haunching etc. finished even and smooth without using extra cement with water proofing compound. Note- WPC shall be paid separately. | 64.00 | Cum |
| 4 | Supply only liquid water proofing compound. | 64.00 | Ltr |
| 5 | Providing and applying HS TPO membrane of 1.2mm thick over the layer of 200gsm Geo-textile with overlap joints of 75mm in both longitudial and traverse direction of the TPO and sealed properly with hot air welding and terminate TPO at the top of parapet wall with termination strip and fix it by screw at 300 mm C/C and sealed with HS jointseal PU on top including surface preparation like remove all loose gravels, dirt, oil, grease and other foreign particles by jet or dry air and clean the surface mechanically or by grinding to make it smooth before application and PCC/cementitious coving of 75mm radius shall be provided at all junction between vertical and horizontal faces before applicaiton of TPO completely as per specificaiton and direction. | 1900.00 | Sqm |
6 Days Left