Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3889143 |
|---|---|
| Organisation Name | Rural Development Department |
| Tender Brief | Providing Percolation Well Terungan At Kondhawal Tal Ambegaon Dist Pune |
| Last Date For Submission | 6th Apr, 2026 |
| Opening Date | 07 Apr, 2026 |
| Document Cost | 1000.00 |
|---|---|
| EMD | 3185.00 |
| Estimated Cost | 318535.00 |
| City | Pune |
|---|---|
| State | Maharashtra |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Item No.1:- Excavation in general in hard material comprising of soft rock, hard rock, Manjara rock,etc. by blasting/controlled blasting / chiselling as required in wet or dry condition for head works such as percolation well, jack well, etc. for lift U to 1.50 M and lead of 150 M including baricating, guarding, disposing off surplus excavated stuff within a radius of 0.5 km. as directed by Engineer-in-charge, etc. complete, excluding refilling. (for head works on river side) MJP DSR 2023-24, Item No.10(b), Page No.17, with 10% jexira for hilly area) Lift 0.00 to 1.50 M | 169.560 | Cu.Mt |
| 2 | Item No.2:- Lift 1.50 to 3.00 M | 169.560 | Cu.Mt |
| 3 | Item No.3:- Excavation in general in hard material comprising of soft rock, hard rock, Manjara rock, etc. by blasting/controlled blasting / chiselling as required in wet jor dry condition for head works suuli as percolavon well, jack well, etc. for lift 0 to 1.50 M and lead of 150 M including baricating, guarding, disposing off surplus excavated stuff within a radius of 0.5 km. as directed by Engineer-in-charge, etc. complete, excluding refilling. (for head works on river side) MJP DSR 2023-24, Item No.14, Page No.17, with 10% extra for hilly area+ 1%cess charges) Lift 3.00 to 4.50 M | 117.750 | Cu.Mt |
| 4 | Item No.4:- Lift 4.50 to 6.00 M | 75.360 | Cu.Mt |
| 5 | Item No.5:- Dewatering including diversion of streams, etc. as may be necessary for foundation and other parts of work during excavation and till its completion in all respects, etc. complete. MJP DSR 2023-24, Item No.14, Page No.17, with 10% extra for hilly area+ 1%cess charges) | 75.000 | BHP/HRS |
5 Days Left