Tendering Authority: Defence Research And Development Organisation
Tender ID4860628
Organisation NameDefence Research And Development Organisation
Tender BriefProvision Of Extension Of Building Infrastructure At Mfcr, P2 Site, Mahakalpada Of Onm (ad Radars) Unit Drdo, Puri Odisha
Last Date For Submission21st Jul, 2026
Opening Date22 Jul, 2026
Cost
Document Cost0.00
EMD1660620.00
Estimated Cost83031000.00
Location
CityPuri
StateOdisha

Register to see full details

BOQ Items
#ItemQtyUnits
1SUBHEAD - I : SITE CLEARANCE AND EARTH WORK EXCAVATION
2Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of Soil249.00Cum
3Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming & watering, lead up to 50m & lift upto 1.5m. (In foundation back fill, building & Traverse)160.00Cum
4Boring, providing and installation bored cast-in-situ reinforced cement concrete piles of grade M-25 with minimum 400Kg cement as per IS code 2911 of specified diameter and length below the pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. by percussion drilling using Direct mud circulation (DMC) or Bailer and chisel technique by tripod and mechanical Winch Machine all complete, including removal of excavated earth with all its lifts and leads (length of pile for payment shall be measured up to bottom of pile cap). Note: Truck Mounted rotary/TMR/Tubewell boring machine shall not be used . (a) 450 mm dia piles5749.72Metre
5Vertical load testing of piles in accordance with IS 2911 (Part IV) including installation of loading platform by Kentledge/Anchor piles method and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the direction of Engineer in-charge. Note: 1. Initial and Routine Load Test shall not be carried out by Dynamic method of testing. Note: 2. Testing agency shall submit the design of loading platform for the approval of Engineer-in-charge