Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4806205 |
|---|---|
| Organisation Name | Water Resources Department |
| Tender Brief | Corrigendum : Bank Protection And Recharging Structure Near Vidhyapeeth Pushkar, Capacity Enhancement Of Rhs Feeder Of Budha Pushkar Tehsil Pushkar, Repair Work Of Bhanwta Anicut Tehsil Ajmer, District Ajmer |
| Last Date For Submission | 24th Jul, 2026 |
| Opening Date | 27 Jul, 2026 |
| Document Cost | 10000.00 |
|---|---|
| EMD | 1233640.00 |
| Estimated Cost | 61682000.00 |
| City | Pushkar |
|---|---|
| State | Rajasthan |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. Thick | 23400.000 | Sqm |
| 2 | Prepration of old masonry surfaces before laying of further masonry or concrete over it by cleaning the surface and mortar joints with brushing and raking finally, washing by compressed air & water under pressure. | 432.000 | Sqm |
| 3 | Demolishing stone rubble masonry including stacking of usable material and disposal of unuseable material within 50 meters lead inclusive of de-watering wherever required.In cement mortar The rates given are for dismantling of good quality work.For dismantling poor quality or weathered; weakened work the rates will be reduced by 30 percent | 129.960 | Cum |
| 4 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Hard soil mixed with Kankar / boulders, Morrum | 1860.080 | Cum |
| 5 | Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de-watering wherever required complete in all respect. Soft / Disintegrated rock | 1860.080 | Cum |
3 Days Left