Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4302292 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Corrigendum : Repair Of Road Pushkar Ghati To Budha Pushkar Km 0/0 To 2/500 Under Ridf-xxvii Risk And Cost |
| Last Date For Submission | 25th May, 2026 |
| Opening Date | 26 May, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 12900.00 |
| Estimated Cost | 645000.00 |
| City | Pushkar |
|---|---|
| State | Rajasthan |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | WORK | ||
| 2 | DESCRIPTION OF WORK | ||
| 3 | Providing, laying, spreading and compacting stone aggregate of specific size as per table 400-6 & 400-7 to Water Bound Macadam specification including spreading in uniform thickness, hand packing, rolling with power roller 8-10 tonnes, in stages to proper grade and camber, applying and brooming requisite type of Crushable screening to fill-up the interstices of coarse aggregates, watering (with water browser) and rolling, making necessary earthen bund to protect edegs, lighting, guarding, barricading and maintenance of diversion etc. [MoRTH specification : Clause 404] (by manual means) with all leads (compacted thickness as specified to be measured) Grading no.3 (53-22.4 mm) crusher broken | 60.000 | Cum |
| 4 | Providing and laying granular sub-base material having P.I.not more than 6, including compacted thickness and consolidation by 8-10 tonne power roller at OMC to achieve desired density to required camber and grade including cost of water and hire charges of machinery, including T&P and all lead of material from quarry (compacted thickness to be measured). Grading as per MoRTH specification : Table 400-1, 400-2 with CBR value not less than 15. To achieve 100% Proctor density | 675.00 | Cum |
| 5 | Providing and applying primer coat over prepared surface or granular base with bitumen emulsion as per IS: 8887 & manufacturer s specifications @ 8.5 kg /10 sqm with a self propelled or towed bitumen pressure sprayer equipped for spraying the material uniformly at specified rates and temperatures including cleaning of road surface as per MoRTH specification CIause- 502,112 | 2400.000 | Sqm |
4 Days Left