| Tender ID | 4947694 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Corrigendum : Erection And Dismantling Of Pantoon Bridge On Bhurkusha Ghat Of Ganga River In Block Deenshah Gaura Vidhansabha Unchahar Of Distt Raebareli |
| Last Date For Submission | 22nd Jul, 2026 |
| Opening Date | 22 Jul, 2026 |
| Document Cost | 860.00 |
|---|---|
| EMD | 300000.00 |
| Estimated Cost | 3000000.00 |
| City | RaeBareli |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Erection Work :- Laying of wooden anchors in the river on the up stream/ Down stream side of the pontoon bridge site including their weaving packing the sand filled bags (av 90 bags) properly before laying and ixing to pontoon with coir rope/ sisall rope excluding cost. (As per Kumbh Mela SOR SI No. 6, Page No. 5) | 145.00 | Each |
| 2 | Carrying of pantoon in pair from river bank in Bhurkusha Ghat side up stream to bridge side 2 km. distance to the alignment of bridge in water and fixing the same with other pantoon pair and reflexing the same in bridge alignment.(up steem Bhurkusha Ghat side to river bank in 2km.) (As per Kumbh Mela SOR SI No. 3, Page No. 5) | 80.00 | Pair |
| 3 | Cartage and laying of chaquered plate including loading unloading cost of carriage from store and laying at site as per direction of Engineer in charge.(As per Kumbh Mela SOR SI No. 7, Page No.5) | 1320.00 | Nos. |
| 4 | Fixing of railing post in position including making 16 mm dia 25 cm deep hole with the help of gererator and drill machine over sleeper and all saf edging before fixing the railling post with hepl of 300x16 mm size nut and bolts at 1.25mtr. c/c including all labour, material T&P etc. (As per Kumbh Mela SOR SI No. 8, Page No. 5) | 640.00 | Nos. |
| 5 | Cartage of wooden anchor from store to bridge head including loading unloading cartage etc. as per direction of Engineer in Charge (only for Departmental work) (As per Kumbh Mela SOR SI No. 12, Page No. 5) | 145.00 | Nos. |