Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4441548 |
|---|---|
| Organisation Name | Rashtriya Chemicals And Fertilizers Limited |
| Tender Brief | Contract For Resurfacing Of Various Plants Bituminous Road At Rcf Thal |
| Last Date For Submission | 19th Jun, 2026 |
| Opening Date | 19 Jun, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 700000.00 |
| Estimated Cost | 0.00 |
| City | Raigad |
|---|---|
| State | Maharashtra |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | EXCAVATION FOR ROADS IN SOILS OF ALL TYPES INCLUDING DRESSING SECTION TO REQUIRED CAMBER AND SIDE SLOPES, DAMAGED ASPHALT ROAD PATCHES, CONCRETE, BOLDERS ETC. IN REGULAR SHAPE LIKE SQUARE OR RECTANGLE FOR LAYING BM/FULLGROUT/CARPET ETC. INCLUDING DISPOSAL OF DEBRIS WITHIN FACTORY AREA/OUTSIDE PREMISES AS DIRECTED BY EIC. | 100.000 | Cu.M |
| 2 | PROVIDING DRY TRAP RUBBLE STONE SOLING 15 TO 20 CM. THICK INCLUDING HAND PACKING, FILLING THE VOIDS WITH SAND, GRIT, EARTH ETC. INCLUDING ROLLING BY STATIC ROLLER, WATERING ETC. COMPLETE AS DIRECTED BY EIC. | 46.500 | Cu.M |
| 3 | PROVIDING AND CONSTRUCTING W.B.M. ROAD IN LAYERS OF 75/100 MM COMPACTED THICKNESS, PREPARATION OF SUBGRADE WITH MURUM SCREENINGS, INCLUDING SUPPLYING AND CONVEYING ALL MATERIALS WITH ALL LEADS AND LIFTS, SPREADING, SECTIONING, ARTIFICIAL WATERING AND COMPACTING IN LAYERS WITH VIBRATORY ROLLER AS DIRECTED BY EIC INCLUDING MAINTENANCE OF DIVERSION ROAD DURING CONSTRUCTION ETC. COMPLETE FOR THE REQUIRED WIDTH OF ROAD AS DIRECTED BY EIC. | 180.000 | Cu.M |
| 4 | PROVIDING 50 MM [ABOUT 2 ] THICK GROUT BITUMINIOUS ROAD SURFACE INCLUDING SUPPLYING ALL MATERIALS, PREPARING THE EXISTING ROAD SURFACE LAYING THE REQUIRED THICKNESS OF METAL LAYER, HEATING AND SPRAYING BITUMEN DOSE OF 04 KG/1 SQM, SPREADING CHIPS, LAYING WITHOUT SEAL COAT, MANUAL LAYING FOR POT HOLES AND COMPACTING WITH STATIC POWER ROLLER ETC. COMPLETE. [WITH BULK BITUMEN 60/70GRADE OR VG30]. | 2300.000 | Sq.M |
| 5 | PROVIDING AND LAYING BITUMINOUS TACK COAT BY MANUAL/MECHANICAL SPRAYER INCLUDING SUPPLYING ALL MATERIALS, PREPARING THE EXISTING SURFACE, HEATING BITUMEN AND APPLYING TACK COAT EVENLY ON THE SURFACE ETC. COMPLETE @ 0.5 KG./SQ.M. OF BITUMEN. [WITH BULK BITUMEN 60/70 GRADE OR VG30] | 50000.000 | Sq.M |
19 Days Left