Tendering Authority: Military Engineer Services
Tender ID4831587
Organisation NameMilitary Engineer Services
Tender BriefCorrigendum : Provn Of Soakage Well Near Building No P-40, P-34 And P-19 Of Hq Cosa At Naya Raipur Mil Stn Under Revenue Work For The Fy 2026-27
Last Date For Submission31st Jul, 2026
Opening Date03 Aug, 2026
Cost
Document Cost500.00
EMD11700.00
Estimated Cost582000.00
Location
CityRaipur
StateChhattisgarh

Register to see full details

BOQ Items
#ItemQtyUnits
1M&L RCC NP3 150 mm dia meter pipe depth avarage 0.70m to 1.65 mtr with 150 mm th PCC in 1:4:8, laid on 150 mm thick bed with excevation in any type of soil including main holes/drop manhole of standerd size made of brick masonary/RCC/Precast RCC with SFRC ventilating cover and frame. Including all items and activities to execute and sewer line functional complete.13.00RM
2M&L RCC NP3 200 mm dia meter pipe depth avarage 0.70m to 1.65 mtr with 150 mm th PCC in 1:4:8, laid on 150 mm thick bed with excevation in any type of soil including main holes/drop manhole of standerd size made of brick masonary/RCC/Precast RCC with SFRC ventilating cover and frame. Including all items and activities to execute and sewer line functional complete.13.00RM
3M & L Soakage wells excavation, in any type of soil, foundation in PCC 1:3:6, walls of honey combed masonry with top ring of M25 concrete including intercepting chamber and screen chamber made of Brick masonary in CM, RCC cover slab in M25/ SFRC cover, interconnecting pipes of RCC/DWC complete filled with brick bats of size 3.6M diaX4.5 M effeftive depth complete all as specified and directed.1.00EACH JOB
4Excavation in trenches not exceeding 1.5m wide and not exceedinf 1.5m in depth; for foundation, etc. or for shafts, wells, cess pits, manholes, pier holes, etc. not exceeding 10 Sqm on plan and not exceeding 1.5 m in depth and getting out in hard/dense .4.00Cum
5M&L for PCC (1:3:6) type C2 (using 40 mm graded stone aggregate) as in foundation filling and mass concrete complete all as specified.1.00Cum
31st Jul, 2026