Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4859455 |
|---|---|
| Organisation Name | All India Institute Of Medical Sciences |
| Tender Brief | Provision And Installation Of Mgps Pipelines, Gas Outlets, And Alarm Systems At Ctvs Transplant Ward In Aiims Raipur. |
| Last Date For Submission | 20th Jul, 2026 |
| Opening Date | 21 Jul, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 7000.00 |
| Estimated Cost | 336890.00 |
| City | Raipur |
|---|---|
| State | Chhattisgarh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Supplying, Laying, testing and commissioning of Medical grade copper pipe as per BS EN: 13348:2016 standards. It should be solid drawn; seamless, deoxidized, non-arsenical, half hard, tempered and degreased copper pipe confirming to the standard. All copper pipes should be medical grade degreased & delivered capped at both ends. The Copper pipes should be accompanied with Manufactured Test certificate for the physical properties & chemical composition. Degreasing of pipe shall be such that there is less than 20mg/m2 (0.002mg/cm2) of hydrocarbons on the degreased surface when tested by the method specified BS EN: 13348:2016.Copper pipes must be inspected and duly Third Party Certified by (Lloyd s Registered Asia). BSI KITE Marked & CE Marked Copper pipes/tubes size and thickness of copper pipes of 28 mm, 22 mm, and 15 mm. Pipeline Installation: Before erection, all copper pipes, fittings like bends, tees, reducers etc. should be cleaned for dirt, and should be degreased. Proper pipe cutters and bending machine should be used during installation of Copper pipes. All copper fittings like bends, Tees, reducers and straight couplings should be of same make as of copper pipes. Copper pipes and copper fittings must be manufactured by same manufacturing company. Each copper fitting of size 42mm or above should be individually packed. Brazing of pipe joined by silver brazing method for copper to copper. Inert gas welding technique should be used by passing Nitrogen gas inside the copper pipes during silver brazing, in order to avoid carbon deposition inside the copper pipes. All the installed pipes and joints must be leakage test with nitrogen gas for 24 hours before fixing of gas outlet and paint. | ||
| 2 | 15mm OD X 0.9mm WT | 30 | Meter |
| 3 | 22 mm OD X 0.9mm WT | 170 | Meter |
| 4 | 28 mm OD X 0.9mm WT | 80 | Meter |
| 5 | Supply, installation, testing and commisioning of BS type front loading Outlets (indian) for Oxygen, Vacuum & Air 4. The outlet Units are must designed and manufactured in India under BS EN 13485 Medical Devices: Quality Management Systems. The units comprise of a first fix, second fix and a second fix valve assembly and connect medical appliances to the gas supply system. The first fix comprises of a brass pipeline termination cylinder with a 12mm BS EN 13348 copper pipe for brazing to the fixed pipeline system, or with a NIST BS EN 18082 (no interchangeable screw thread) connector for connection to a hose assembly. A mounting box suitable for both surface and flush installations is also provided. The Unit must designed to enable gas probes to be connected and disconnected easily and with minimal effort and the same time as giving a strong, reliable and secure connection. They are available for oxygen, Nitrous oxide, Medical air, surgical air, and Medical vacuum, Carbon Dioxide, Nitrogen and AGSS. The terminal units can be flexibly integrated into any type of installation including surface, flush, bedhead and pendant and are supplied with a 1 year warranty. |
13 Days Left