Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Public Works Department
Tender ID3959750
Organisation NamePublic Works Department
Tender BriefConstruction Of Tourist Guest House At Nowshera, Rajouri. (under Capex Budget)
Last Date For Submission30th Apr, 2026
Opening Date01 May, 2026
Cost
Document Cost6000.00
EMD683660.00
Estimated Cost34183000.00
Location
CityRajouri
StateJammu and Kashmir

Register to see full details

BOQ Items
#ItemQtyUnits
1Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge in all kind of soil.5457.00Cum
2Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil210.00Cum
3Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering all work up to plinth level in 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate) 40mm nominal size crushed.87.00Cum
4Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)81.00Cum
5Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-incharge. Note: - Cement in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is content considered payable or recoverable separately. All works upto plinth level295.00Cum
30th Apr, 2026

20 Days Left

WhatsApp