Tender BriefCorrigendum : Permanent Restoration By Way Of Construction Of Protection Work To Pump Room, Sump Tank And Allied Structures At Drari Under Wss Drari.
Last Date For Submission27th Jun, 2026
Opening Date29 Jun, 2026
Cost
Document Cost1000.00
EMD23360.00
Estimated Cost1168000.00
Location
CityRajouri
StateJammu and Kashmir

Register to see full details

BOQ Items
#ItemQtyUnits
1Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides andramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavatedearth as directed: All kinds of soil.57.84cum
2Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides andramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavatedearth as directed: Ordinary rock.14.46cum
3Providing and laying cement concrete 1:4:8 mix (1 cement:4 course sand :8 graded stone aggregate 40mm nominal size) incl. Curing but cxcl. Cost of form work8.47cum
4Providing and laying cement concrete 1:3:6 mix (1 cement:3 course sand :6 graded stone aggregate 20mm nominal size) incl. Curing but cxcl. Cost of form work110.86cum
5Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-incharge. Note: - Cement in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is content considered payable or recoverable separately.All works above plinth level upto floor V level 0.95cum