Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Pradhan Mantri Gram Sadak Yojana
Tender ID4240532
Organisation NamePradhan Mantri Gram Sadak Yojana
Tender BriefPermanent Restoration Of Road From Jungrial Treru Stage-ii Under Saski
Last Date For Submission16th May, 2026
Opening Date16 May, 2026
Cost
Document Cost600.00
EMD8000.00
Estimated Cost400000.00
Location
CityRajouri
StateJammu and Kashmir

Register to see full details

BOQ Items
#ItemQtyUnits
1Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil :36.3Cum
2Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size)5.53Cum
3Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.13.5Cum
4Random Rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including levelling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) and curing complete at window sills, ceiling level and the like: Cement mortar 1:6 (1 Cement : 6 coarse sand)9.11Cum
5Dry random rubble masonry with hard stone in foundation and plinth: With bond stone3.62Cum
16th May, 2026

4 Days Left

WhatsApp