| Tender ID | 4050927 |
|---|---|
| Organisation Name | Jammu And Kashmir State Power Development Corporation |
| Tender Brief | Corrigendum : Repair/stabilizat Ion Of Slopes From Cr Adit Of Hrt To Bailey Bridge (re Tender) |
| Last Date For Submission | 16th May, 2026 |
| Opening Date | 18 May, 2026 |
| Document Cost | 5000.00 |
|---|---|
| EMD | 1359128.00 |
| Estimated Cost | 67956000.00 |
| City | Ramban |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Engagement of labours for cleaning loose rock and other loose material. | 66.000 | Days |
| 2 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. Ordinary Rock | 750.000 | Cum |
| 3 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etc upto floor V including curing but excluding the cost of centring, shuttering and finishing with. 1:1 :3 (1 cement :1 coarse sand: 3 graded stone aggregate 20 mm nominal size) | 2401.300 | cum |
| 4 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-incharge. Note: - Cement in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is content considered payable or recoverable separately. All works above plinth level upto floor V level | 801.000 | cum |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for: Retaining walls, return walls, walls (any thickness) including attached pilasters | 2361.900 | sqm |