Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Military Engineer Services
Tender ID4114819
Organisation NameMilitary Engineer Services
Tender BriefCorrigendum : Special Repair To Or Married Accn Building No P-29 19 Camp At Prc Ramgarh Cantt
Last Date For Submission1st Jun, 2026
Opening Date08 Jun, 2026
Cost
Document Cost500.00
EMD97389.00
Estimated Cost4869420.00
Location
CityRamgarh
StateJharkhand

Register to see full details

BOQ Items
#ItemQtyUnits
1Taking down existing roof treatment any thickness with brick tiles including plastering, leaping plaster of any thickness cuting & up rooting tree roots/vegitable growth & removing the debris from the premises upto 500m from the MOD land including cleaning/washing down and keeping surfaces clean complete all as specified and as directed.21.52Cum
2M & L for brushing neat cement slurry (@ 3 Kg of cement per Sqm) mixed with water proofing compound in the proportion ,water proofing compound, water and cement (1:4:7) or as per manufacturer's instructions for bonding of old concrete surface to new concrete, complete all as specified and as directed. Note:Water proofing compound shall be measured and paid seprerately under respective item of "BoQ"220Sqm
3M & L for PCC (1:2:4) ,type B-0 (using 12.5mm graded crushed stone aggregate) mixed with integral water proofing chemical compound, mixed in proportion 200 milli litre per 50 Kg of cement as in padding, benching, sunken portion etc.,on roof surface for correcting/ making proper slope on roof, etc.,complete all as specified and directed. Note:Water proofing compound shall be measured and paid seprerately under respective item of "BoQ"8.8Cum
4M & L for cutting 75 mm wide and 65 deep in brick wall/PCC block/RCC surface any location shaping horizontal face groove filled with PCC (1:2:4) type B-0 (using 12.5mm graded crushed stone aggregate) with and including chemical compound mixed in proportion 200 mili litre per 50 Kg of cement or as per manufacturer's instructions laid when concrete is still green, complete all as specified and as directed.(Note:Water proofing compound will be measured and paid seprerately under respective item of "BoQ")116Rm
5Supply only liquid water proofing compound ISI mark complete all as specified and directed.15ltr
1st Jun, 2026

5 Days Left

WhatsApp