Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4123868 |
|---|---|
| Organisation Name | Directorate Of Urban Local Bodies |
| Tender Brief | Awasthapana Nidhi Ke Antargat Gangadas Ki Puliya Ke Nikat Ward No-10 Nagar Palika Parishad Swar Me Gata No-186 Per Frame Structure Dukano Ka Nirman Karye. |
| Last Date For Submission | 25th May, 2026 |
| Opening Date | 25 May, 2026 |
| Document Cost | 3221.00 |
|---|---|
| EMD | 273017.00 |
| Estimated Cost | 2730168.00 |
| City | Rampur-UP |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.5 meters and lead upto 30 meters and including filling, watering and ramming of excavated earth into the trenches or into the space between the builiding and sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer-in-charge upto a distance of 30 meters from the foundation trenches (SI. No. 251) UPPWD SOR-2022 1-Coloumn Footing 2-Long Wall 3-Short wall | 84.08 | cum |
| 2 | Filling with good quality earth brought from outside approved borrow area, including cost of earth, royalty, loading, transportation, unloading, spreading in layers not exceeding 20 cm thickness, watering, ramming and compaction by manual/mechanical means to achieve desired compaction and level, complete in all respects as directed by the Engineer-in-Charge." | 173.4 | cum |
| 3 | Concrete with 4 cm guage stone ballast, coarse sand and cement in proportion of 8:4:1 in foundation and under floors including supply of all material, labour, T&P etc. required for proper completion of the work. (SI. No. 281 ) 2022 1-Coloumn Footing 2-Long Wall 3-Short wall | 12.25 | cum |
| 4 | R.C.C. work with cement approved coarse sand & 2 cms. Guage approved crushed stone grit in proportion of 1:1.5:3 in Raft foundation windows and sunshades excluding supply of reinforncement and its bending but including its fixing & binding the same with 24 BWGGI binding wire & including necessary centering & shuttering etc. required for proper completion of work. Binding wire is to be supplied by the contractor free of cost. .UPPWD (SI. No. 287) SOR 2022 | 18.9 | cum |
| 5 | R.C.C. work with cement approved coarse sand & 2 cms. Guage approved crushed stone grit in proportion of 1:1.5:3 in Columan windows and sunshades excluding supply of reinforncement and its bending but including its fixing & binding the same with 24 BWGGI binding wire & including necessary centering & shuttering etc. required for proper completion of work. Binding wire is to be supplied by the contractor free of cost. .UPPWD (SI. No. 289) SOR 2022 1-Upto Ground Floor 2-G.F Slab To F.Floor Slab | 10.72 | cum |
26 Days Left