Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: State Building Construction Corporation Limited
Tender ID4032689
Organisation NameState Building Construction Corporation Limited
Tender BriefConstruction Of Sports Complex In Giridih Block Under Giridih District
Last Date For Submission8th May, 2026
Opening Date11 May, 2026
Cost
Document Cost10000.00
EMD1417000.00
Estimated Cost0.00
Location
CityRanchi
StateJharkhand

Register to see full details

BOQ Items
#ItemQtyUnits
1Earth work in excavation in foundation trenches in ordinary soil (wide classification of soil item-A) and disposal of excavated earth as obtained to a distance up to 50M, including all lifts, leveling, ramming the foundation trenches, removing roots of trees, shrubs all complete as per approved design, building specification and direction of E/I12407.035Per M3
2Filling in foundation trenches and plinth in layers not exceeding 150 mm thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation of foundation trenches within a lead of 50M and lift of 1.5 M all complete as per building specification and direction of E/I (Mode of measurement compacted volume).1864.471Per M3
3Filling in foundation trenches and plinth in layers not exceeding 150 mm thick well watered, rammed, fully compacted and fine dressed with earth obtained after cutting within a lead of 50M and lift of 1.5 M all complete as per building specification and direction of E/I (Mode of measurement compacted volume).2276.365Per M3
4Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per building specification and direction of E/I (Mode of measurement compacted volume).357.968Per M3
5Providing and fixing at or near ground level precast cement concrete in kerbs, edgings etc. as per approved pattern and setting in position with cement mortar 1:3 (1 Cement : 3 coarse sand), including the cost of required centering, shuttering complete. 1:1 :3 (1 Cement: 1 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size .53.860Per M3
8th May, 2026

20 Days Left

WhatsApp