Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3764092 |
|---|---|
| Organisation Name | State Building Construction Corporation Limited |
| Tender Brief | Corrigendum : Construction Of 08 Lane Modern Synthetic Athletics Track In The Outdoor Stadium At Kamar Dudhani,dumka |
| Last Date For Submission | 15th Apr, 2026 |
| Opening Date | 16 Apr, 2026 |
| Document Cost | 10000.00 |
|---|---|
| EMD | 761000.00 |
| Estimated Cost | 0.00 |
| City | Ranchi |
|---|---|
| State | Jharkhand |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. Rate per cum for grading - I Material | 2151.60 | cum |
| 2 | Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm) to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achievethe desired density, complete as per specifications and directions of Engineer-in- Charge. | 1075.80 | cum |
| 3 | Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. | 7172.00 | sqm |
| 4 | Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.3 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. | 7172.00 | Sqm |
| 5 | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregate of specified grading , premixed with bituminous binder @ 4.5 % by weight of total mix and filler, transporting the hot mix to work site laying with a hydrostatic paver finisher with sensor control to the required graded, level and alignment , rolling with smooth wheeled ,vibratory and tandem rollers to achieve the desired compaction as per MORTH specificetion clause no. 505 complete in all respects. Sandwich System | 358.60 | cum |
12 Days Left