Tendering Authority: State Building Construction Corporation Limited
Tender ID3764092
Organisation NameState Building Construction Corporation Limited
Tender BriefCorrigendum : Construction Of 08 Lane Modern Synthetic Athletics Track In The Outdoor Stadium At Kamar Dudhani,dumka
Last Date For Submission15th Apr, 2026
Opening Date16 Apr, 2026
Cost
Document Cost10000.00
EMD761000.00
Estimated Cost0.00
Location
CityRanchi
StateJharkhand

Register to see full details

BOQ Items
#ItemQtyUnits
1Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. Rate per cum for grading - I Material2151.60cum
2Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm) to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achievethe desired density, complete as per specifications and directions of Engineer-in- Charge.1075.80cum
3Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.7172.00sqm
4Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.3 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.7172.00Sqm
5Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregate of specified grading , premixed with bituminous binder @ 4.5 % by weight of total mix and filler, transporting the hot mix to work site laying with a hydrostatic paver finisher with sensor control to the required graded, level and alignment , rolling with smooth wheeled ,vibratory and tandem rollers to achieve the desired compaction as per MORTH specificetion clause no. 505 complete in all respects. Sandwich System358.60cum