| 1 | Earthwork excavation in foundation trenches and column and plinth etc in all kinds of soil lead up to 100 Mtrs. and lift upto 1.5 Mtrs including stacking the excavated earth not more than 3 M from the edge of excavation and then rerturning the soil in 15 cm layers when required in plinths and sides of the foundation etc. consolidating each deposited layers by watering, ramming and the disposing offal surplus excavated soil in a lead of 30 Mtrs. as directed by Engineer-in- Charge. all labour charges, cost of transportation charges, minor tools, GST, Cess etc., Complete. | 6.00 | Cum |
| 2 | Providing and laying CC 1:3:6 (1 cement, 3 pulvarized sand & 6 stone chips of size 2cm graded Sri Vijaya Puram Local quarry) in all CC works as directed by the EIC, including cost of cement, cost of stone chips and pulvarized sand, screening and washing of both the aggregates, cost of nominal centering and shuttering charges, mixing concrete, conveying the concrete, placing in position, consolidation with vibrator, curing, including cost of all materials, all labour charges, transportation charges, minor tools, GST, Cess etc., Complete. | 0.60 | Cum |
| 3 | Providing and laying RCC M20 (1:1.5:3 one cement, one and half mainland river sand & three stone chips) using 20mm graded stone chips from mainland, Mainland river sand 43 grade ordinary portland cement for cast-in- situ concrete and as directed by the EIC, inculding cost of cement, cost of stone chips and mainland river sand all labour charges for mixing conveying placing consolidation screeing and washing of stones chips and sand transportation charges of all materails to work site and running charges of concrete mixer, vibrator, consumables and all other required materials, cost of minor tools and plant, GST, Cess etc., Complete. (But excluding cost of shuttering which will be paid separately) | 3.00 | Cum |
| 4 | Supply delivery and transportation of steel of grade Fe 500 HCR/CRS for fabrication and fixing of reinforcement for substructure and superstructure works as per the direction of EIC including cost of fabrication and fixing steel rods, cost of steel rods, all handling charges, cutting, bending, lapping, welding in position wherever necessary and tying with black 18 SWG annealed binding wire, all labour chargs, transportation charges of all materials to Work Site, cost of binding wires, all T&P required for the work, minor tools, GST, Cess etc., complete. | 4.00 | Qtl |
| 5 | Providing form work including centering & shuttering so as to give a rough finish, strutting and propping etc. and removal of the same from reinforced cement concrete and plain concrete work as directed by the EIC, including cost of plywood, centering and shuttering, all labour charges, cost of binding materials, cost of transportation charges of all materials to work site, cost of ballies, cost of minor tools, GST, Cess etc., Complete. | 30.00 | Sqm |