Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4644294 |
|---|---|
| Organisation Name | Forest Department |
| Tender Brief | Corrigendum : Construction Of Second Floor Of Rapid Response Team Ranni Building In Ranni Range During The Year 2026-2027 |
| Last Date For Submission | 1st Jul, 2026 |
| Opening Date | 03 Jul, 2026 |
| Document Cost | 2760.00 |
|---|---|
| EMD | 45200.00 |
| Estimated Cost | 1806848.00 |
| City | RANNI |
|---|---|
| State | Kerala |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Centering and shuttering including strutting, etc. and removal of form for:Suspendedfloors, roofs, landings, balconies and access platform | 161.030 | M2 |
| 2 | Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 3000.000 | kg |
| 3 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.405 | M3 |
| 4 | Reinforced cement concrete work in beams, suspended floors, roofs, having slope upto 15 landings, balconies, shelves, chajjas, lintels, bands, plain window sills,staircases and spiral stair cases up to floor five level excluding the cost of centering,shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 15.969 | M3 |
| 5 | Providing and laying Autoclaved Aerated concrete (AAC) blocks masonry 150mm/230mm/300 mm thick with Grade- I AAC blocks in super structure above plinth level up to floor V level with RCC band at sill level and lintel level with approved block laying polymer modified adhesive mortar all complete as per direction of Engineer-in-Charge. (The payment of RCC band and reinforcement shall be made for seperately) | 35.582 | M3 |