Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4855455 |
|---|---|
| Organisation Name | Rural Development Department |
| Tender Brief | Constructing Anganwadi Building At Soundal Pajvewadi. Tal. Rajapur For The Year 2025 26 |
| Last Date For Submission | 20th Jul, 2026 |
| Opening Date | 22 Jul, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 12000.00 |
| Estimated Cost | 946451.00 |
| City | Ratnagiri |
|---|---|
| State | Maharashtra |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Item No. 1 :- Excavation for foundation in hard murum including removing the excavated materials upto a distance of 50 metres beyond the building area & lift as specified, stacking & spreading as directed including dewatering unless provided elsewhere, preparing the bed for the foundation & necessary backfilling, ramming, watering complete including shoring & strutting- | 20.76 | Cmt. |
| 2 | Item No. 2 :- Excavation for foundation in H.R. by Chiselling including removing the excavated materials upto a distance of 50 metres beyond the building area & lift as specified, stacking & spreading as directed including dewatering unless provided elsewhere, preparing the bed for the foundation & necessary backfilling, ramming, watering complete including shoring & strutting.SSR P/I 21.20 = 1169.00+10%H.A=1285.90 | 2.31 | Cmt. |
| 3 | Item No.3:-Providing and laying Cast in situ cement concrete inM-10 of trap/ granite/ quartzite/ gneiss metal for foundation andbedding including bailing out water, formwork, laying/pumping,compacting, roughening them if special finish is to be provided,finishing if required and curing complete, with fully automaticmicro processor based PLC with SCADA enabled reversibleDrum Type mixer/concrete Batch mix plant (Pan mixer) etc. complete. With natural sand/V.S.I. quality Artificial Sand | 7.24 | Cmt. |
| 4 | Item No.4:- Providing laterite stone masonry in cement mortar 1:6 in Foundation and plinth including racking out joints where plastering is to be done watering and scaffolding complete.Basic rate as per B&C Letter no.4 | 18.10 | Cmt. |
| 5 | Item No.5:- Filling in plinth and floors with approved excavated materials /contractor materialin 15 Cm. to 20 Cm. layers including watering and compaction complete. | 1.00 | No. |
13 Days Left