Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4174047 |
|---|---|
| Organisation Name | Rural Development Department |
| Tender Brief | Corrigendum : Constructing Anganwadi Building At Palu Tal Lanja For The Year 2025 |
| Last Date For Submission | 26th May, 2026 |
| Opening Date | 29 May, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 12000.00 |
| Estimated Cost | 935754.00 |
| City | Ratnagiri |
|---|---|
| State | Maharashtra |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Item No 1 Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 3.00 m.) By Manual Means | 22.25 | cmt |
| 2 | Item No 2-Providing and laying Cast in situ/Ready Mix cement concrete M-10 of trap/ granite/quartzite/gneiss metal for coping to plinth or parapet, moulded or chamfered as per drawing or as directed including steel centering, plywood/ steel formwork compacting, roughening them if special finish is to be provided, finishing uneven and honeycombed surface and curing etc. complete. The Cement Mortar 1:3 plaster is considered for rendering uneven and honeycombed surface only. Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc. (Wooden centering will not be allowed.) With fine aggregate (Crushed sand VSI Grade) | 5.21 | cmt |
| 3 | Item No 3 Providing laterite stone masonry in C. M. 1:6 in foundation & plinth including striking joints on the unexposed faces & watering complete.As per New Supplimentry | 22.40 | cmt |
| 4 | Item No 4 Providing laterite stone masonry in C. M. 1:6 in superstructure & plinth including striking joints on the unexposed faces & watering complete.As per New Supplimentry | 18.04 | cmt |
| 5 | Item No 5- Filling in plinth and floors with approved excavated material in 15cm. to 20cm. Layers including watering and compacting etc. complete. | 22.25 | cmt |
5 Days Left