Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Rural Development Department
Tender ID4340122
Organisation NameRural Development Department
Tender BriefCorrigendum : Constructing R.c.c. Bandhara Saldure
Last Date For Submission31st May, 2026
Opening Date02 Jun, 2026
Cost
Document Cost1000.00
EMD39963.00
Estimated Cost0.00
Location
CityRatnagiri
StateMaharashtra

Register to see full details

BOQ Items
#ItemQtyUnits
1SUB ESTIMATE NO- 1: R.C.C.Bandhara1.00Cmt
2Item no 1 :- Clearing and grubbing road land including uprooting rank vegetation, grass, bushes,shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier anddisposal of unserviceable materials and stacking of serviceable material to be used orauctioned up to a lead of 1000 metres including removal and disposal of top organic soilnot exceeding 150 mm in thickness.170.00Cmt
3Item No. 2 - Excavation in soft rock without blasting including boulders up to 0.6 m diameter (0.113 cum) for canal, seating of embankment, filter drain / catch water drains etc., and placing the excavated soft rock neatly in dump area or for formation of service road including cost of all materials, machinery, labour, dressing bed & sides to required level and profile etc. complete with leads as below and all lifts as directed.142.50Cmt
4Item No. 3 - Excavation in hard rock of all toughness by blasting including boulders above 0.6 m dia.(0.113Cum) minimizing damage to side slopes of excavation in water prism area by adopting any one or combination of line drilling /pre-splitting /smooth blasting techniques and placing the excavated rock neatly in approved dump area including cost of all materials, machinery, labour, leveling bed etc., complete with leads as below and all lifts as directed.142.50Cmt
5Item No. 5 -Providing and fixing achor bar of 25mm diamete 3.375 m length with resin bond cement capsule achorage through adit/itself including drilling holes, inserting grout capsule driving achor, cost of all materials, machinery labour ventilation lighting , drainage and other ancilllary operations etc. complet with all lifts as directed.40.00Cmt