Tendering Authority: National Highways And Infrastructure Development Corporation Limited
Tender ID4036357
Organisation NameNational Highways And Infrastructure Development Corporation Limited
Tender BriefCorrigendum : Balance Work For Rectification Of Damages Caused To Bituminous Pavement And Road Side Drain For Laying Of Phed Pipelines In Connection With The Project Work Of Ravangla Tunnel Pkg-iii (design Chainage From Km 32.500 To Km 33.600) Of Nh-510
Last Date For Submission4th May, 2026
Opening Date06 May, 2026
Cost
Document Cost11800.00
EMD54005.00
Estimated Cost2700238.00
Location
CityRavangla
StateSikkim

Register to see full details

BOQ Items
#ItemQtyUnits
1Compacting original ground supporting subgrade (Loosening of the ground upto a level of500 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of table 300-2 for subgrade construction.)458.250CUM
2GSB -Plant Mix Method (Construction of granular sub-base by providing the material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 ) (iii) For Grading-III Material160.900CUM
3Wet Mix Macadam (Providing, laying, spreading and compaction graded stone agrregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, layin in uniform layers with pave in sub-base /base course on well prepared surface and compacting with vibratory roller to achieve the desired density.)201.130CUM
4Prime coat (Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate shown in 500-1 using mechanical means.) ii) Medium Porosity804.500SQM
5Tack coat (Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at required rate on the prepared bituminous/granular surface cleaned with mechanical broom.) i) Normal Bituminous Surface804.500SQM