Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Nuclear Fuel Complex
Tender ID4050986
Organisation NameNuclear Fuel Complex
Tender BriefCorrigendum : Preventive Maintenance Of Ventilation System At Nfc-k
Last Date For Submission19th May, 2026
Opening Date20 May, 2026
Cost
Document Cost0.00
EMD285378.00
Estimated Cost14269000.00
Location
CityRawatbhata
StateRajasthan

Register to see full details

BOQ Items
#ItemQtyUnits
1Preventive Maintenance(PM) of Centrifugal Blowers : Frequency : Quarterly (once in 3 months) PM works involves tbe following: a) Ensure Drive V-Belts tension (if reqd, adjust motor) b) Replace damaged V-belts c) Ensure coupling in good condition (if reqd, replace) d) Grease the Brearings e) Ensure Flexible joints in good condition (if reqd, replace) f) Ensure Belt guard in good position (if reqd, reset) g) Grease Damper bearings h) Ensure all fasteners are in complete fastened conditon (if reqd, fasten) i) Ensure the actuator connections in order (if reqd, refix) j) Report, if any abnormality in functioning Note : PM shall be performed for installed 184 qty per quater.
2Blowers upto 55 KW capacity480Nos
3Blowers from 56 KW to 350 KW capacity256Nos
4Preventive Maintenance(PM) of Horizontal coupled Centrifugal Pumps : Frequency : Quarterly (once in 3 months) PM works involves tbe following: a) Makeup oil in bearing chamber b) Ensure coupling in good condition (if reqd, replace) c) Ensure coupling guard in position (if reqd, adjust & fasten) d) Ensure NO water leakage (if reqd, rectify) e) Remove Strainer clean & re-fit f) Ensure all Nut Bolts are fastened (if reqd, fasten) g) Drain hydrocyclone till sediment is bleeded out h) Report if any abnormality is observed Note : PM shall be performed for installed 32 qty per quater.
5Pumps upto 20 KW capacity108Nos
19th May, 2026

10 Days Left

WhatsApp