Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4447919 |
|---|---|
| Organisation Name | Pradhan Mantri Gram Sadak Yojana |
| Tender Brief | Or-27-904 L029-pwd Road To Lakubadi Under Pmgsy Iv (batch-i) |
| Last Date For Submission | 19th Jun, 2026 |
| Opening Date | 20 Jun, 2026 |
| Document Cost | 10000.00 |
|---|---|
| EMD | 141000.00 |
| Estimated Cost | 7029000.00 |
| City | Rayagada |
|---|---|
| State | Odisha |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | BT Road: Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MORD technical specification cluase 201.1. & direction of Engineer-in-charge (by manual means). | 976.00 | Sqm |
| 2 | Dismantling of existing structures like culverts, bridges, retaining walls and other sturcture comprising of masonry, cement concrete wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable materials and stacking the serviceable materials with all lifts and lead of 1000m as per Technical Specification Clause 202 | 45.00 | Cum |
| 3 | Construction of embankment with approved material obtained from borrow pits with all leads and lifts, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 by mechanical means as per Technical Specification Clause 301.5 and as per the direction of the Engineer in charge. | 2368.66 | Cum |
| 4 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 and as per the direction of the Engineer in charge. | 399.92 | Cum |
| 5 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m | 224.00 | Cum |
19 Days Left