Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Rural Development And Panchayati Raj Department
Tender ID5025856
Organisation NameRural Development And Panchayati Raj Department
Tender BriefConstruction Of Washroom With Tanki At Jamia Masjid Chanjoor Ward No.4 Pyt Bathoie B Pyt Bathoie B Block Mahore Distt. Reasi Under Capex Pri For The Year 2026-27
Last Date For Submission28th Jul, 2026
Opening Date29 Jul, 2026
Cost
Document Cost200.00
EMD2940.00
Estimated Cost147000.00
Location
CityReasi
StateJammu and Kashmir

Register to see full details

BOQ Items
#ItemQtyUnits
1Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. 2.6.1 All kinds of soil0.595Cum
2Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil :1 meter from cutting edge7.58cum
3Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) including all leads, lift and carriage complete0.76cum
4Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) 70% concrete3.27cum
5Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) 30% boulder1.40cum
28th Jul, 2026