Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Haryana Urban Development Authority
Tender ID4248296
Organisation NameHaryana Urban Development Authority
Tender BriefAnnual Maintanence Shopping Centre Sector 5 Rewari
Last Date For Submission18th May, 2026
Opening Date19 May, 2026
Cost
Document Cost295.00
EMD4000.00
Estimated Cost199806.00
Location
CityRewari
StateHaryana

Register to see full details

BOQ Items
#ItemQtyUnits
1[21.90.5.1]Construction of rectangular standard brick masonry manhole chambers to standard drawings on S.W. pipe sewers or other circular pipe sewers up to the required depth in 1.5 cement sand mortar, lime concrete in bed and sides of pipe sewer and cement concrete 1:2:4 in benching, 12 mm thick water tight 1:2 cement sand plaster with a floating coat of neat cement and finished with 2 coats of sodium silicate on interior surface where required, reinforced cement concrete slab 180mm thick fixing 560 mm internal diameter C.I. manhole cover and frame weight not less than 2.5 quintal painted with 3 coats of black bitumen paint, fixing galvanised malleable iron steps embedded in 1:2 cement sand mortar complete. the rate covers the cost of M.S. steel for R.C.C. slab labour for fixing and carriage of C.I. manhole frame and cover and malleable iron steps from the stores of the Engineer-in-charge of the works to the site of works. The rate also include the cost of accurately planned and fitted centring, supports for all works as well as for all curves and special work, cleaning out their beds etc. sodium silicate shall be supplied free of cost at the stores of the Engineer-in-charge. 5.1. On 225 mm internal diameter pipe sewer - for 1.80 meters depth below ground level$4.000Each
2[21.96.2]Providing, lowering, laying, aligning, fixing in position and jointing at all level/ depths ISI marked HDPE pipe of PE-80 grade and PN- 4 for sewer application as per IS 14333-1996 (amended up to date) in trenches in complete including cost of HDPE Specials, labour, sectional hydro testing (including the cost and conveyance of water to site for testing) and commissioning as per Technical Specifications and as per direction of Engineer. Note: E/w to be measured and paid separately. Rate includes cost of all specials like bends, tees required during laying of pipe line along required alignment. 2. 225 mm Outside Dia$70.000Per Metre
3[4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil$135.000cum
18th May, 2026

6 Days Left

WhatsApp