Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3991186 |
|---|---|
| Organisation Name | Directorate Of Urban Local Bodies |
| Tender Brief | Construction Of Boundary Wall In Jogi Dharamshala Ward No 31 Mc Rewari |
| Last Date For Submission | 20th Apr, 2026 |
| Opening Date | 21 Apr, 2026 |
| Document Cost | 1000.00 |
|---|---|
| EMD | 8439.00 |
| Estimated Cost | 421925.00 |
| City | Rewari |
|---|---|
| State | Haryana |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | HSR Item 6.33.6-Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more HSR Rate(Rs.) 66.00 Through Rate | 1033.155 | Kg. |
| 2 | HSR Item 11.71.1-Wall painting on a cement plaster surface with acrylic emulsion paint of approved brand and manufacture to give an even shade : 1. Two or more coats on new work HSR Rate(Rs.) 54.00 Through Rate | 404.800 | Sqm |
| 3 | HSR Item 6.30.6-Centering and shuttering including strutting, propping etc. and removal of form for 6. Columns, Pillars, Piers, Abutments, Posts and Struts HSR Rate(Rs.) 262.00 Through Rate | 40.480 | Sqm |
| 4 | HSR Item 6.15.1-Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor four level, excluding cost of centering, shuttering, finishing and reinforcement : 1. 1:1.5:3 (1 cement : 1.5 coarse sand(zone- III) : 3 graded stone aggregate 20 mm nominal size) HSR Rate(Rs.) 5969.00 Through Rate | 2.328 | cum |
| 5 | HSR Item 7.22.1-Brick work with common burnt clay non- modular bricks of class designation 10.5 in superstructure above plinth level up to floor IV level in all shapes and sizes in : 1. Cement mortar 1:4 (1 cement : 4 coarse sand) HSR Rate(Rs.) 4404.00 Through Rate | 46.552 | cum |
6 Days Left