Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3896670 |
|---|---|
| Organisation Name | Uttarakhand Project Development And Construction Corporation Limited |
| Tender Brief | Corrigendum : Development Of Rehabilitation Site And Construction Of Various Infrastructures (community Centre, Temple, Flats, Convenient Shops, Sewerage, Drainage And Water Supply Work Etc) At Rainapur Grant, Tehsil Rishikesh, Distt. Dehradun. |
| Last Date For Submission | 23rd Apr, 2026 |
| Opening Date | 24 Apr, 2026 |
| Document Cost | 5900.00 |
|---|---|
| EMD | 2450000.00 |
| Estimated Cost | 0.00 |
| City | Rishikesh |
|---|---|
| State | Uttarakhand |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m Excavation for roadwork in soil with hydraulic excavator of 0.9 Cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 | 252.810 | Cum |
| 2 | Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 | 37597.150 | Cum |
| 3 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. By Manual Means, In area of non-thorny jungle | 3.090 | hectare |
| 4 | Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. Ordinary soil, Upto 3 m depth | 2354.180 | Cum |
| 5 | Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer- in- charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction | 1133.330 | Cum |
2 Days Left