Tender BriefSupply, Fabrication, Erection, Testing And Commissioning Of 04 Nos. Scouring Sluice Gate Of Size (1200mmx1500mm) Of Sialjore Saharubagan Check Dam Of Kuarmunda Block Under Minor Irrigation Division, Sundargarh For The Year 2025-26.
Last Date For Submission11th Jun, 2026
Opening Date12 Jun, 2026
Cost
Document Cost4000.00
EMD6700.00
Estimated Cost667491.00
Location
CityRourkela
StateOdisha

Register to see full details

BOQ Items
#ItemQtyUnits
1Supply and fabrication of embedded parts of Scouring Sluice gate consisting of wall liners- 3000X150x8-2 nos wall liners- 3000X100x8-4 nos sill beam- Half cut ISMB200 of 1300 mm-1 nos, Side seal SS seat - 3000 x 60 x 6 - 2 nos, Sill beam SS seat- 1200x60 x 6 - 1 no, 1st stage embedmnents, dia 16 studs,nuts,bolts, washer- 10kgs with all accessories including machinery, fixtures, labour, cutting, alligning, welding, cleaning, finishing, including consumables, all complete as per direction of Engineer- in-charge.The cost is inclusive of contractor profit @7.5% and labour cess @1%.4.00Set
2Supply and Fabrication of Scouring Sluice Gate leaf consisting of Skin plate- 1200x1500x8mm 1no, End Vertical girders- 1500x65x10mm- 2 nos, Horizontal girders- ISA 65x65x6 1160mm-3 nos, Diaphragm 1- 1450x50x8-3 nos Side seal mounting- MS flat 1500x40x8 m- 2 nos, Side seal clamp plate- MS flat 1500x35x8 mm-2 nos, Bronze pad base - plate 80x30x25mm 4 nos, Bronze pad-80x30x12mm- 4 nos, Btm seal-10mm thick-1200 mm long- 1 nos, Btm. seal clamp plate- MS flat 1200x50x8 mm-1 no, Side seal 25mm dia- 1500mm long-2 nos, Lifting Bracket-600x115x12- 2 nos, Lifing Pin- 130mm, dia 30- 1nos, C/s Screw, bolt/nut etc-10 kg with all accessories including machinery, fixtures, consumables, labour, cutting, drilling & boring, alligning, welding, cleaning, finishing all complete as per direction of Engineer-in- charge.The cost is inclusive of contractor profit @7.5% and labour cess @1%.4.00Set
3Supply and Fabrication of Steel hoist bridge of Scouring Sluice gate for single stem Nut type screw gear box hoist consisting of Base plate- 400x200x8mm 4nos, CI gear box base plate- 400x300x16mm- 1no, Supporting beams- ISMB 150- 1800 mm length 2 nos, Anchor bar- Dia 20mm -350mm length 16 nos, Chequered plate- 1500x400x6mm 1 no, with all accessories including machinery, fixtures, consumables, labour, cutting, alligning, welding, cleaning, finishing all complete as per direction of Engineer-in- charge.The cost is inclusive of contractor profit @7.5% and labour cess @1%.4.00Set
4Erection, positioning, alligning, fixing, trial and commissioning of Scouring Sluice gate including unloading and shifting upto location of all componentsof 1st stage and 2nd stage Embedded parts (consisting of sill beam, wall liners, track plates etc), Vertical Gate leaf (complete assembly with fixing of bronze pad, rubber seals), Steel hoist bridge assembly (consisting of hoist platform, Screw rod, lifting gear box, supporting beams, base plates, anchor bolts etc) with all accessories including machinery, fixtures, labour, cutting, alligning, welding, cleaning, finishing total 2109.60 kg gate including consumables all complete as per direction of Engineer in charge. The cost is inclusive of contractor profit @7.5% and labour cess @1%.2109.60kg
5Painting of Scouring Sluice gate of 2nd stage embeded parts(exposed portion), all steel surface of gate including cleaning, degreasing, handling, cost of paint, applying of one coat primer of 40 micron thick & three coats of final paint of 100 micron each, all inclusive of labour, materials & consumables as per direction of Engineer-in- charge. Painting cost of Embeded part (With one coat Zinc primer & 3 coats of Coal tar epoxy paint), Gate Leaf (With one coat Zinc primer & 3 coats of Coal tar epoxy paint), Hoisting Platform (With one coat Zinc primer & 3 coats of Aluminium paint) as per direction of Engineer in charge.The cost is inclusive of contractor profit @7.5% and labour cess @1%.4.00Set