Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4860189 |
|---|---|
| Organisation Name | Municipal Corporation |
| Tender Brief | Construction Work On The New Culvert At Tota Chowk Ward No 46. |
| Last Date For Submission | 13th Jul, 2026 |
| Opening Date | 14 Jul, 2026 |
| Document Cost | 590.00 |
|---|---|
| EMD | 32081.00 |
| Estimated Cost | 320811.00 |
| City | Saharanpur |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil (Loam, clay or sand) Including lift upto 1.50 M. and lead upto 30 M. and including filling watering and rammind of excacated earth into the treaches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in- charge upto a distance of 30 M. from the foundation trenches | 30.72 | cum |
| 2 | Disposal of Excavated Soil up to 5.00 KM distance complete with labour T&P ETC at site. | 24.58 | cum |
| 3 | Cement Concrete in proportion of 8:4:1 with 4cm guage approved stone ballast, Coarse sand & cement in the materials, labour Tools & plants etc. required for proper completion of the work. | 8.46 | cum |
| 4 | R.C.C. Work with cement, approved coarse sand & 2 cm guage approved stone grit in proportions of 1:1.5:3 in lintels of door & windows excluding supply of reinforcement and its bending. But including its fixing and binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, tools & plants etc. required for proper completion of the work, including cost of binding wire. The rate excludes making of drip course which shall be paid extra. | 12.00 | cum |
| 5 | M.S. (tor steel or plain) in Plain work such as R.C.C. or R.B. work including bending for proper shape as necessary inclnding bending for proper complition of the work and including supply of all steel & wastage, bend, hooks and authorised overlapping hall be measured | 1083.00 | kg |
6 Days Left