Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Uttar Pradesh Housing And Development Board
Tender ID3756472
Organisation NameUttar Pradesh Housing And Development Board
Tender BriefCorrigendum : Construction And Repair Of Parks At Shakumbhari Vihar Yojna No-8, Saharanpur
Last Date For Submission16th Apr, 2026
Opening Date16 Apr, 2026
Cost
Document Cost5310.00
EMD219000.00
Estimated Cost10962000.00
Location
CitySaharanpur
StateUttar Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Excavation in foundation in ordinary soil (Loam, clay or sand) i/c filling, watering and ramming of excavated earth into the trenches into the space between the building and the sides of foundation disposal of surplus earth as per direction by E/I upto a distance 30 m from the foundation trenches.19.55Cum
2Cement Concrete with 4 cm Gauge approved Stone ballast,coarse sand (FM 2.20-3.60) & cement in proportion of 8 : 4 : 1 in foundation including supply of all materials, labour and T & P etc. Required for proper completion of the work.96.13Cum
3R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:1.5:3 in R.C.C. Raft Foundation & Footings excluding supply of reinforcement and its bending, but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour, T&P etc. required for proper completion of the work including cost of binding wire.6.63Cum
4R.C.C work with cement approved coarse sand (F.M. 2.20 TO 3.60) and 2cm [3/4"] gauge approved stone grit in the proportion 1:1.5:3 in RCC Column excluding supply of reinforcement and its binding the but including its fixing and binding the same with 24 B WG binding wire and including necessary centering and shuttering etc, and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works including cost of binding wire.9.86Cum
5R.C.C work with cement approved coarse sand (F.M. 2.20 to 3.60) and 2cm gauge approved stone grit in the proportion 1:1.5:3 in RCC Slab,lintle.bands excluding supply of reinforcement and its binding the but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc, and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works including cost of binding wire.15.21Cum
16th Apr, 2026

8 Days Left

WhatsApp