Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3991019 |
|---|---|
| Organisation Name | Jharkhand State Rural Road Development Authority |
| Tender Brief | Construction And Maintenance Of Roads And Lsbs |
| Last Date For Submission | 28th Apr, 2026 |
| Opening Date | 28 Apr, 2026 |
| Document Cost | 10000.00 |
|---|---|
| EMD | 2459000.00 |
| Estimated Cost | 122551400.00 |
| City | Sahibganj |
|---|---|
| State | Jharkhand |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | (1)-Construction & Maintenance of Road from L025-Mines Road to Tetaria Length- 1.85 Km, Block-Mandro, District-Sahibganj,Jharkhand. Setting out etc all complete job as per specification and directioni of E/I | 1.850 | Per km |
| 2 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical specification Clause 201. | 16650.000 | Per Sqm |
| 3 | Dismantling of Cement Concrete Pavements as per Technical Specification clause 202 Dismantling of Pavement by mechanical means using pneumatic tools breaking of pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000m, stacking serviceable and unserviceable materials separately. SOR NO.2.15 | 106.875 | Per Cum. |
| 4 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. ( Dismantling of cement concrete) | 2.400 | Per Cum. |
| 5 | Dismantling of Rubble masonary/Brick masonary in cement mortar Vide SOR 2.6/2.7 (B) | 25.669 | Per Cum. |
14 Days Left