Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4361286 |
|---|---|
| Organisation Name | Rural Development And Panchayat Raj Department |
| Tender Brief | Corrigendum : Construction Of Girls Toilet P.u.e School At Thalvallam H/o P.k.hills Melnadu Pedhanaickenpalayam Block In Salem District Focus Block Development Programme Savings Fund - 2025-26 |
| Last Date For Submission | 10th Jun, 2026 |
| Opening Date | 10 Jun, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 11000.00 |
| Estimated Cost | 1100000.00 |
| City | Salem |
|---|---|
| State | Tamil Nadu |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | 1) Construction of Girls Toilet P.U.E School @ Thalvallam H/O P.K.Hills Melnadu | ||
| 2 | Earth work excavation for foundation (for narrow excavation) in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. | 24.120 | Cu.m |
| 3 | Earth work excavation for foundation (for narrow excavation) in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers Gadebeam aall Allround | 1.440 | Cu.m |
| 4 | Flooring Concrete 1:4:8 (One cement, Four sand and Eight hard broken stone) using 40 mm gauge hard broken jelly for flooring including laying, consolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete complying with standard specification. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers. | 7.460 | Cu.m |
| 5 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 4.980 | Cu.m |
13 Days Left