Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4352994 |
|---|---|
| Organisation Name | Rural Development And Panchayat Raj Department |
| Tender Brief | Corrigendum : Improvement Of The Road From Danishpet Panchayat, Gandhi Nagar, Chandran Thottam Tar Road To Bethel D.d. Colony Danishpet Panchayat Kadayampatty Block In Salem District General Fund - 2025-26 |
| Last Date For Submission | 11th Jun, 2026 |
| Opening Date | 11 Jun, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 27000.00 |
| Estimated Cost | 2700000.00 |
| City | Salem |
|---|---|
| State | Tamil Nadu |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | 1.)Upgradation of the road from Gandhi Nagar Chandiran Thottam BT Road to Bethel AD Colony. H/O : Danishpet. | ||
| 2 | Clearing Scrub jungle including cutting all trees and other vegetation and depositing them beyond the road as directed by the departmental officers Including all labour charges etc., complete. | 243.00 | Sqm |
| 3 | Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Plant Mix method) . | 183.23 | cum |
| 4 | Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction | 40.50 | cum |
| 5 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 254.81 | cum |
15 Days Left