Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4144571 |
|---|---|
| Organisation Name | Irrigation And Flood Control Department |
| Tender Brief | Corrigendum : Restoration/re-construction Of Flood Protection Work By Way Of Spurs, Revetment Crates And Embankment U/s And D/s Of Mount No. 62 Upstream Of B.o.p. Tanvar On Right Bank Of River Basantar (at Spots) Part-a |
| Last Date For Submission | 11th May, 2026 |
| Opening Date | 12 May, 2026 |
| Document Cost | 5000.00 |
|---|---|
| EMD | 596000.00 |
| Estimated Cost | 29800000.00 |
| City | Samba |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) overareas(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) includingdisposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 5725.55 | cum |
| 2 | Filling/packing of stones in Zinc Coated Gabion crates mechnically woven double twisted hexagonal in shape having wire mesh size of 100x120 mm & having mesh wire dia. 2.7 mm, Selvedge Wire dia: 3.4 mm& lacing wire dia. 2.2 mm excluding cost of gabion crates and stones. | 10246.50 | cum |
| 3 | Earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m in all kinds of soil: | 2661.12 | cum |
| 4 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 4580.20 | cum |
| 5 | Dry stone pitching (any thickness) excluding cost of stones.On Horizontal | 126.00 | cum |
5 Days Left