Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4462803 |
|---|---|
| Organisation Name | Rural Development Department |
| Tender Brief | Construction Of Bridge Over River Ong On Temerimal To Ganjadabar (rd) Road |
| Last Date For Submission | 16th Jun, 2026 |
| Opening Date | 17 Jun, 2026 |
| Document Cost | 10000.00 |
|---|---|
| EMD | 458211.00 |
| Estimated Cost | 45821082.00 |
| City | Sambalpur |
|---|---|
| State | Odisha |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earthwork in excavation in cutting in hard soil within the initial lead and lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3 mtr in depth etc complete as per the direction of the Enngineer in Charge. | 4,203.530 | cum |
| 2 | Earth work excavation in foundation in all knds of soil within all leads and lifts including shoring, shuttering, propping bullahs, piling, dewatering from the foundation, supply and working of pumps stacking the excavated material away from the work in site. | 2,381.090 | cum |
| 3 | Filling sand-Supplying and filling good clean river sand of approved quality including watering to complete saturation and ramming complete with all leads and lifts including cost, conveyance, royalty and taxes of all materials and cost of all labour and TandP required for the work etc. complete as per specification and direction of Engineer in charge. | 10.460 | cum |
| 4 | Plain cement concrete M-15 grade in Sub-Structure complete as per drawing and technical specification. | 25.240 | cum |
| 5 | Cement concrete (1:3:6) in foundation and plinth with 4cm. crusher broken granite metal of approved quality from approved quarry including hoisting lowering and laying in layers not exceeding 150mm. thick with proper packing and ramming each layer of concrete by means of vibrator ,providing groove and beads where necessary including curing, dewatering, shoring, shuttering if necessary at the time of laying concrete with cost, conveyance royality and taxes of all material required for the work including supplying and working pumps, TandP articles finishing the exposed surface smooth as per specific ation and direction of the Engineer-in Charge . In Foundation | 201.200 | cum |
14 Days Left