| Tender ID | 3928502 |
|---|---|
| Organisation Name | Works Department |
| Tender Brief | Improvement Such As Widening And Strengthening Of Road From Saida Mausima Pada To Patrapali Road Via Nh-59 Saida Badkisanpada And Tunguripada Of Kuchinda Nac From 0-000 Km To 5-624 Km In The District Of Sambalpur For The Year 2025-26 |
| Last Date For Submission | 21st Apr, 2026 |
| Opening Date | 22 Apr, 2026 |
| Document Cost | 10000.00 |
|---|---|
| EMD | 988700.00 |
| Estimated Cost | 98868418.00 |
| City | Sambalpur |
|---|---|
| State | Odisha |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting trees rank vegetation, grass, bushes, shrubs, saplings and girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres etc. complete as per specification and direction of Engineer-in-charge. | 26712.0000 | Sqm |
| 2 | Excavation for roadwork in soil with hydraulic excavator of 0.9cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment and as per MoRT&H Specifications etc complete. | 6500.6800 | Cum |
| 3 | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material upto 1000m lead including cost of all labour, machinery etc complete per Technical Specifications and Clause 305.4.3 of MoRT&H Specifications for Road & Bridge works (5th Revision). | 16173.5000 | Sqm |
| 4 | Re-working of scarified bituminous surface suitably after supplementing base materials with sand & compacting finished surface including cost, conveyance, royality of sand & cost of all labour, machinery etc complete as per Technical Specifications and Clause-501.8.3.2 of MoRT&H Specifications for Road & Bridge works (5th Revision). | 16173.5000 | Sqm |
| 5 | Loosening, leveling and Compacting original ground to facilitate placement of first layer of embankment, scarified to a depth of 150mm, compacted at OMC to achieve minimum dry density conforming to Table 300-2 with cost of all labour, machinery etc complete as per Technical Specifications and Clause - 305.3.4 of MoRT&H Specifications for Road & Bridge works (5th Revision). | 2540.4300 | cum |