Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Water Resources Department
Tender ID4242288
Organisation NameWater Resources Department
Tender BriefRenovation Of Canal System Of Hirakud Dam Project Of Lower Huma Canal Section Sambalpur Irrigation Division Sambalpur
Last Date For Submission1st Jun, 2026
Opening Date02 Jun, 2026
Cost
Document Cost10000.00
EMD3118000.00
Estimated Cost311728907.00
Location
CitySambalpur
StateOdisha

Register to see full details

BOQ Items
#ItemQtyUnits
1Clearing and grubbing land in canal slope work including uprooting rank vegetation, grass, bushes, shrubs, sapling and trees girth upto 300mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm in thick. complete as directed by the Engineer-in-charge.106259Sqm
2Earth work in excavation of foundation in hard soil or gravelly soil with all lead ,lifts and delifts including dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m depth including cost of all labour ,materials & T&P etc.Complete as directed by the Engineer-in-charge.31071.48Cum
3Filling in foundation and plinth with sand including watering and ramming with cost, conveyance, royalty etc. complete as per direction of the Engineer-in-Charge.10707.49Cum
4Cement concrete M-15 using 40 mm & down graded H.G.C.B. Chips free from weathered skin surface including cost, carriage royalty and taxes of all materials to the work site mixing and laying of concrete in position and compacted properly with all leads, lifts, sundries, T & P required for the work etc. complete as per the direction of the Engineer in charge.5527.74Cum
5Plain Cement concrete M-20 grade with CBHG coarse aggregate 20mm down graded metal of approved quality mixing by concrete mixture and placing manually,compacting with vibrator including cost of all materials,labour charges with all lead by mechanical means and placement within initial leads of 50m and initial lift of 1.50m for mixing concrete including conveyance, royalty & taxes etc. of all materials, T&P, watering & curing, B&O.C. Workers Welfare Cess etc. complete as directed by the Engineer-in-charge.129.84Cum
1st Jun, 2026

20 Days Left

WhatsApp