Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4255515 |
|---|---|
| Organisation Name | Panchayati Raj Department |
| Tender Brief | Corrigendum : 4- Gram Behta Jaysingh Me Zila Panchayat Bhawan Ke Avashyak Avshesh Karya |
| Last Date For Submission | 7th Jun, 2026 |
| Opening Date | 08 Jun, 2026 |
| Document Cost | 2596.00 |
|---|---|
| EMD | 42400.00 |
| Estimated Cost | 2118518.00 |
| City | Sambhal |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50 M, and lead upto 30 M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in charge upto a distance of 30 M from the foundaiton trenches. (Where machine can not reach/move). For Building work onlv | 228.13 | cum |
| 2 | Cement Concrete with 4cm. guage approved stone ballast coarse sand and cement in proportion of 4:2:1 including supply of all 5.4.1materials, labour and T&P etc. required for proper completion of work. | 28.31 | cum |
| 3 | M-150 brick work in 1 :6 (one cement and six fine sand of 1.25 F .M. mortar) in foundation and plinth including supply of all meterials, labour and T&P etc. required for proper comolelion of work | 111.96 | cum |
| 4 | R.C.C. Work with cement approved coarse sand and 2cm. gauge approved stone grit in proportion of 1:1.5:3 in lintels of doors, windows and sunshades excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I Binding wire and including necessary centering and shuttering etc. and supply of all meterials, labour and T&P etc. required for proper completion of work. Binding wire to be supplied by the contractor free of cost Including making of drip coarse | 19.19 | cum |
| 5 | R.C.C plinth beam mix 1:1.5:3 M20 | 7.69 | cum |
7 Days Left