Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4034913 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Year 2025-26 Widening And Strengthening Work Of Bilari Darni Road (odr) |
| Last Date For Submission | 25th Apr, 2026 |
| Opening Date | 25 Apr, 2026 |
| Document Cost | 2354.00 |
|---|---|
| EMD | 3000000.00 |
| Estimated Cost | 173500000.00 |
| City | Sambhal |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Construction of Embankment with approved material obtained form road side with all lifts and leads, transporting to site, spreading, grading to required slope and compecting to meet requirement of table 300-2 and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. | 50500.000 | Cum |
| 2 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. | 17265.000 | Cum |
| 3 | Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. | 6790.000 | Cum |
| 4 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. | 6320.000 | Cum |
| 5 | Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. | 24620.000 | sqm |
7 Days Left