Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4449722 |
|---|---|
| Organisation Name | Public Health Engineering Department |
| Tender Brief | 05/2026-27 Work For Removing Of Leakage /choking In Difference Size Of Pipe Line At Uwss Phulera Jurisdiction Of Sub Dn. Sambhar Lake. (arc) |
| Last Date For Submission | 8th Jun, 2026 |
| Opening Date | 09 Jun, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 24000.00 |
| Estimated Cost | 1200000.00 |
| City | Sambhar |
|---|---|
| State | Rajasthan |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Maintenance of pipelines irrespective of size and material which includes repairing of bursts and leakages, pollution control, survey and removal of choking, disconnection of illegal connections, collection and recording minimum 10 nos. residual chlorine samples during daily supply timings, interconnections and all works related to pipeline network in existing distribution/ rising main pipelines of all sizes by digging out suitable size of pit in soft and loose soil/ hard soil including cutting of black top, WBM and CC top of road of any size at work site. This will also include cutting of pipe ends, fixing of pipe piece with jjointing material to make repair leak proof and refilling of pit by excavated sand by ramming it at sides of pipes and upto ground level. For entire job, contractor will use their own T and P. Contractor with his own resources shall arrange de-watering, JCB and tractor compressor if any and restore any amenity at his own cost damaged while performing the work in this item. The work includes daily patrolling and repair the leakages within stipulated time and complete maintenance of pipeline network of rising and distribution pipeline network within the scope of work for per km pipeline per month. Jointing material shall be provided by the department. Minimum labour for a following kms pipelines to be deployed: | ||
| 2 | 101 km to 200 km - two fitter-II and four beldar | 1308 | Per Mtr Par Month |
| 3 | Work timely bill distribution to the consumer as received from bill printing agency and approved by AEN incharge per bill distributed per month | 41200 | KW |
| 4 | Work of inter Connection in AC/PVC pipe line including dismentalling of BT road/ CC road/ excavation of soil, cutting of existing pipeline, jointing of Tee (complete) and other specials excluding sluice valve, dewatering, transportation from JE store and providing adequate safety of site & testing for water proof inter connection using his own T&P, labour & dewatering pump etc. required to complete the job. (Material such as Tee/ Tee Clamp/ rubber sheet/ CID joints required for Inter connection shall be provided by the department free of cost). | ||
| 5 | In Kucchha |
8 Days Left