Tender ID4830611
Organisation NameRural Development Department
Tender BriefRepairs To Percolation Tank At Maldad Khabadi Tal Sangamner Dist-ahilyanagar
Last Date For Submission10th Jul, 2026
Opening Date13 Jul, 2026
Cost
Document Cost1180.00
EMD33199.00
Estimated Cost3319885.00
Location
CitySangamner
StateMaharashtra

Register to see full details

BOQ Items
#ItemQtyUnits
1Cleaning cutting thorny shrubs bushes, grass with 15m. lead and all lifts etc. complete as directed.2756.00Sqm
2Excavation in all kinds of soil & Soft murum including boulders up to 0.6 m diameter (0.113 cum) for canal, seating of embankment, filter drains / catch water drains etc., and acing the excavated stuff neatly in dump area or for formation of service road / embankment as irected including cost of all materials, machinery, labour, dressing bed and sides to required level and profile etc. complete with leads as below and all lifts as directed.332.00Cum
3Excavation in hard murum including boulders up to 0.6 m diameter (0.113 cum) for canal, seating of embankment, filter drains / catch water drains etc., and placing the excavated stuff neatly in dump area or for formation of service road / embankment including cost of all materials, machinery, labour, dressing bed and sides to required level and profile etc., complete with leads as below and all lifts as directed.3857.00Cum
4Excavation in soft rock without blasting including boulders up to 0.6 m diameter (0.113 cum) for canal, seating of embankment, filter drain / catch water drains etc., and placing the excavated soft rock neatly in dump area or for formation of service road including cost of all materials, machinery, labour, dressing bed & sides to required level and profile etc. complete with leads as below and all lifts as directed.382.00Cum
5Excavation in hard rock of all toughness by breaker including boulders above 0.6 m dia.(0.113Cum) minimizing damage to side slopes of excavation and placing the excavated rock neatly in approved dump area including cost of all materials, machinery, labour, leveling bed etc., complete with lead up to 15 m and all lifts as directed.248.00Cum